SAIGONTEL officially started building the ICT TOWER II

Written by  - Thursday, 02 August 2018

On August 2, 2018, the Groundbreaking Ceremony of the ICT Tower II was held at Quang Trung Software City (QTSC). The ceremony was attended by leaders of Quang Trung Software Park One-member Limited Liability Company (QTSC), representatives of ACC Joint Stock Company 244 - Project Contractor, representatives of Technology Consulting Joint Stock Company Representatives of SAIGONTEL's customer companies, Leadership Board of Saigon Telecommunication and Technologies Corporation (SAIGONTEL) - Investor, Leaders of member companies in SAIGONTEL GROUP.

IMG 3121

Representatives of SAIGONTEL Board of Directors and its member companies and the contractor commenced the ceremony

ICT Tower II is adjacent to SAIGON ICT I building - located at the most favorable location of Quang Trung Software City (QTSC). According to the latest assessment of KPMG Vietnam, QTSC ranked third among eight technology parks in terms of occupancy rates, compensation policy, telecommunications infrastructure ... and standing No. 4 on the factors related to scale, efficiency of enterprises, attracting FDI capital, skills of human resources.

About building SAIGON ICT TOWER, the building came into operation from 2008 to now occupancy rates have reached 100% and attracted large companies such as SWISS POST SOLUTION, NEOBAGS, NINA TRADING AND SERVICES, GREEN SYSTEM / GREEN TITLE ... trust and set up an office here. Investors working here will enjoy many preferential policies of the City and special tax incentives.

ICT 1

SAIGON ICT TOWER

ICT Tower II with 12 floors and 1 basement with total area of ​​17,878 m2. The basement area is 2,001 m2 - it is expected to be a smart car park, the ground floor is expected to be rented for trade center, office or showroom, floor 2 ~ 12 is expected to be office for rent. With the design of "green architecture, the interior space of the building will create comfort with architecture welcoming the wind, light combined with green trees create scenery, air conditioning, natural lighting creates the lips. A friendly campus for office staff in the ICT II office building

In addition, the ICT Office Building 2 is also equipped with a Connected IP Infrastructure with integrated systems as follows:

  • The IP (wire, wireless) network system will help smart devices connect to each other. Users can also access different privileges.
  • Access Control: access control of doors or passages by fingerprint or fingerprint authentication, or password on differently-identified identifiers for each employee of the company.
  • The camera system consists of bringing the image to the user using devices such as TVs, computers and mobile phones via the internet. Helps manage more actively wherever you are.
  • Early warning systems with sensors for: heat, smoke, motion, contact, ... ensure the highest level of security for all customers working in the building.
  • In addition, systems such as lightning control, smart grids use information and communication technologies to optimize transmission and distribution of power between manufacturers. and integrated consumer electronics infrastructure with a communications infrastructure or building management system that allows for integrated control and management that allows for enhanced performance and cooling. The energy efficiency of the building will also be studied in the ICT Tower II.

In particular, the model that the ICT Office Building II will put into operation will be the "Coworking Shared Space Worker" model that meets the needs of working for the star-up who need a working space. dynamic ventilation. Integrated showroom, coffee shop, a library of carefully selected books, galleries and events. This model promises to break the traditional framework of high quality, cost effective and flexible work space.

ICT 2

ICT Tower II Design photo

In addition, the professional management team, intensive training, layout, rich experience will ensure the creation of new values, bringing great benefits to customers, partners and social. . ICT Tower II will meet the demand for the services of an office building and reliable standard is Class A office.

With total investment capital of 250 billion VND, ICT Tower II will be completed and put into operation in Q4 / 2019.

Link update from the press:

http://vinacorp.vn/saigontel-cong-bo-le-ra-mat-du-an-toa-nha-van-phong-ict-ii-n80078.html

http://s.cafef.vn/sgt-272948/saigontel-dau-tu-250-ty-dong-xay-toa-nha-van-phong-hang-a.chn

PR Dept.

Our Strategic Partners